Quote from Moz:
Here's a basic PRV tool for Qlink, not quite like Mak's but it's something. I use Mak's PRV sheets with IB as they are first class.
If you scroll down column B on the qlink sheet, you'll see were to change the contract specs at rollover.
MOZ,
You rock! It worked great. And by checking out the Qlink code it finally clicked and now I can modify or the other sheets or even create my own. I'm truly dangerous now

Thanks,
-EZ
