In contrast there is the 2 point system on the RUT.
Signals for RUT 5 days 2 point grid:
Enter +2 points
TS -2 points on grid
Current direction is down.
Short since 806
TS currently at 804 (eventually locked in 2 points)
Trail down on grid, i.e. if RUT crosses 800 down move stop to 802
Systems could be overlayed and signal might cancel out each other. Stops are essential and are not to removed (but trailed...).
Signals for RUT 5 days 2 point grid:
Enter +2 points
TS -2 points on grid
Current direction is down.
Short since 806
TS currently at 804 (eventually locked in 2 points)
Trail down on grid, i.e. if RUT crosses 800 down move stop to 802
Systems could be overlayed and signal might cancel out each other. Stops are essential and are not to removed (but trailed...).