I have a question for volente or jagmot .... or anyone else ...
Say you're flat, and you're waiting for your next entry at 10 pts from the last reaction low/high. Within any 10 point move there are usually several wave/retracement cycles. When does the reaction high/low from one of these "internal" waves qualify as significant enough to be your new start point from which to measure 10 points for the next entry?
Thanks.
Say you're flat, and you're waiting for your next entry at 10 pts from the last reaction low/high. Within any 10 point move there are usually several wave/retracement cycles. When does the reaction high/low from one of these "internal" waves qualify as significant enough to be your new start point from which to measure 10 points for the next entry?
Thanks.
