Smoothing time series data in order to remove noise usually produces an indicator that moves slower than the original time series. For example, a 30 day MA has 15 days of delay. Lots of people tried to solve this problem. This is my (and A.Kondakov) variant (Blue and White lines). Red line - 14 MA.
